Site Prep
Week 15, 2026 – Road-closure sign installed
8 April 2026
The orange road-closure sign appeared: “deze weg is afgesloten van 20 apr. 06h t/m 31 dec. 2027”. Installed almost two weeks before it actually takes effect — nice of them to give us notice. So we’re looking at roughly 20 months of closure if they keep to plan.